PCT701

Introduction of preventive item inspection before voltage transformer is put into use

Preventive testing is an important link in the operation and maintenance of power equipment, and it is one of the effective solutions to ensure the safe operation of power equipment. In order to better ensure that various technical indicators of voltage transformers meet the standards, power engineering construction companies will carry out preventive tests on…

Triggering conditions for protection mechanisms of protective transformers

The intelligent motor protector integrates the functions of measurement, control, protection, network communication, etc., and can protect the three-phase asynchronous motor. The modular design of the fully intelligent motor protector, the main controller and the display operation module are separated, according to the actual situation whether to use the display operation module. The product is…