What are the wiring principles of current transformers that are widely used

Electrical debugging is a key content in the work of power installation engineering projects. In the electrical debugging work, the secondary circuit inspection is also a key adjustment content. It is related to the precise measurement, maintenance, communication and other functions of the power supply system. A prerequisite that cannot be fully utilized. In the…

Details
PCT701

Introduction of preventive item inspection before voltage transformer is put into use

Preventive testing is an important link in the operation and maintenance of power equipment, and it is one of the effective solutions to ensure the safe operation of power equipment. In order to better ensure that various technical indicators of voltage transformers meet the standards, power engineering construction companies will carry out preventive tests on…

Details

Triggering conditions for protection mechanisms of protective transformers

The intelligent motor protector integrates the functions of measurement, control, protection, network communication, etc., and can protect the three-phase asynchronous motor. The modular design of the fully intelligent motor protector, the main controller and the display operation module are separated, according to the actual situation whether to use the display operation module. The product is…

Details

What is the relationship between light gas action and current transformer

The safe operation and management of transformers is the focus of everyone’s daily work. Based on the experience exchange of abnormal operation conditions and common problems analysis of transformers, it will be helpful to immediately and accurately determine the causes and characteristics of common faults, and take immediate measures to ensure The safe operation of…

Details

Current transformers are widely used. What are the wiring principles?

[vc_row][vc_column][vc_column_text]Electrical debugging is a key content in power installation engineering project work. In electrical debugging work, secondary loop inspection is also a key adjustment content. It is related to the precise measurement, maintenance, and communication of the power supply system. A prerequisite that cannot be fully utilized. In the secondary loop, whether the wiring of…

Details